Antalya Water and Waste Water Project Design and Control Services

  • Financing : World Bank
  • Service : Construction Supervision
  • Employer : Antalya Water and Wastewater Administration (ASAT)
  • Project Duration : 2011-2016

According to World Bank Precedure and Principles (ICB/NCB), Supervision of Construction Works was made for 4 packaged construction works. 

  1. ASAT2-W1- For Kepez, Muratpaşa, Aksu and Döşemealtı District Municipalites, Kızıllı, Kurşunlu, Topallı, Fettahlı Districts water supply network and domestic network; for water supply network line, approximately 101.750m long, with a diameter between 63mm-325mm and for domestic network,line approximately 58.050m long with a diameter between 32mm-63mm.


2) ASAT2- W2 - ASAT 14 units of deep well drilling in Drinking Water Plants Rehabilitation Works Termessos District; construction, machine, electricity infrastructure revision and landscape Works in Duraliler - Boğaçay-YSE Pumping Station and Termessos Storage District.


3) ASAT2-W3 – Sewerage system construction work in Muratpaşa, Konyaaltı, Kepez Districts:
Processing sewerage lines with corrugated pipe with length of approximately 90.345m; with diameter between 200 - 1600 mm. Construction of 1865 units of Flue with diameter between  1200-2400 m, approximately 2900 units of parcel flue with diameter of 800mm and 200mm parcel line laying with a length of approximately 20.000m, implemention of soil amendment work when necessary.


4) ASAT2-W6 – Sewerage System and Collector construction work in Kepez, Döşemealtı and Konyaaltı Districts:
Sewerage network line with corrugated pipe; approximately 17.685m long with diameter between 200-300mm; collector line with reinforced concrete pipe; approximately 13.985m long with diameter between 1200 – 1400 mm. And construction of collector line with corrugated pipe; approximately 645m long and 1200mm diameter. .