- Water recource planning
- Surface water treatment plant(187x 106 m3/year)
- Groundwater (80×106 m3/year)
- Spring sources (20 x106 m3/year)
- Final design of water supply system
- Existing network mapping
- Network modelling (For dynamic simulations KYPIPES/CYBERNET is used in AutoCAD environment in conformity with GIS)
- District Metering
- Design of district metering system including link to existing SCADA system
- Tendering of flow meters, system appurtenances and installation works
- SCADA system extension
- Reduction of unaccounted for water
- Water metering equipment
- Pressure reduction measures
- Leak detection measures\
- Selection of priority areas of implementation
- Consulting on reduction of unaccounted for water
- Tender documents for supply of goods and services to install water and pressure metering equipment
Project Characteristics
Population
Present Population : 1.050.000
Design(N2020) : 2.300.000
Water Demand
Present Water Demand: 5 m3/sec
Design Water Demand : 11 m3/sec
Supply Mains
Approximately 50 kms,
Diameters DN 300-1600 mm
Distribution Network
App. 3200kms,
DiametersDN 100-1600 mm
Services Provided:
Resource evaluation
Planning
Network analysis/Network modelling
Detailed design
Reduction measures of unaccounted for water
Preparation of tender documents for supply of flow and pressure metering equipment
Consultancy on installation of flow and pressure metering equipment adaptable for transmitting data to SCADA system.