Consultancy Services for Preparation of Revision Planning Report for Water Supply from Çamlı Dam in İzmir

  • Financing : Equity Capital
  • Service : Planning Report, Water Supply
  • Employer : General Directorate of İzmir Water and Sewerage Administration (İZSU)
  • Project Duration : 2011 - 2012

It has been prepared that revision of planning report for Çamlı Dam within the borders of Güzelbahçe district of İzmir province, as a local resource to meet the increasing drinking and utility water needs of İzmir city.

Within the scope of Çamlı Dam Planning Report; according to the changing climatic conditions, hydrological studies have been renewed, natural construction equipment studies and laboratory analyzes have been reconstructed, and a roller compacted concrete dam at a height of 81.00 m above the stream thalweg has been proposed. It has been observed that 13 hm³ of drinking water per year can be provided to the city of İzmir with the Çamlı dam.