Consultancy Services for WasteWater Network and Collectors, Stream Improvement, Wastewater Treatment Plant and Sea Discharge Projects for İSKİ

  • Financing : Equity Capital
  • Service : Wastewater and Stormwater Networks, Wastewater Treatment Plants
  • Employer : General Directorate of İstanbul Water and Sewerage Administration (İSKİ)
  • Project Duration : 2008 - 2011

Preparation of Advanced Biological Wastewater Treatment Plant Application Projects

Scope of the project covers preparation of regional wastewater sectoral plan for the study are designs for approximately 100 km wastewater network and collector lines,50km creek rehabilitation, 1 pumping station, 2 wastewater preliminary treatment and 4 sea outfall and 6 advanced biological Wastewater Treatment Plants (WWTP) for population varying between 120 000-1.600.000.

WWTP flows:

Büyükçekmece WWTP Daily dry weather flow Qapprox: 581.851 m3/g

Çanta WWTP Daily dry weather flow Qapprox.: 222.609 m3/g

Tuzla WWTP Daily dry weather flow Qapprox: 200.000m3/g

Silivri WWTP Daily dry weather flow Qapprox: 172.236 m3/g

Riva WWTP Daily dry weather flow Qapprox: 35.000 m3/g

Kilyos WWTP Daily dry weather flow Qapprox: 30.000 m3/g

Services provided by ALTER;

  • Preparation of regional sectoral plan considering the short-term and long-term wastewater needs of the study area
  • Preparation of application projects for wastewater network and collector lines.
  • Preparation of bill of quantities for wastewater and collector lines
  • Preparation of application projects for creek rehabilitation.
  • Preparation of application projects for pumping stations
  • Preparation of application projects for Advanced Biological WWTPs with various capacities.
  • Preparation of bill of quantities for WWTPs
  • Preparation of application projects for Kilyos, Çanta, Silivri and Selimpaşa Sea outfall