1st Phase: Consultancy Services for Non-Revenue Water Reduction and Operational Capacity Strengthening
2nd Phase: Construction Supervision
Project tasks were as follows:
TASK A: Mapping of distribution network
TASK B: Verification and final establishment of pressure zones, hydraulic modeling and bulk metering
TASK C: Leak detection campaign, district metering and selective pipe replacement
TASK D: Implementation of SCADA system
TASK E: Improvement of water treatment plant
TASK F: Institutional strengthening and training
TASK G: Supervision of construction and installation works
TASK H: An additional task was assigned to Alter International in March, 2007 for structuring and establishment of ESKI’s GIS based Infrastructure Information System (ESBIS).
PROJECT CHARACTERISTICS
Present Population:500.000
Present Water Production: 81.508 m3/day
Present Billed Water consumption: 42.732 m3/day
Water Supply Mains and Distribution Network: App 1100 km (DN100 mm – DN 1200 mm)