Kayseri Water Supply Project, SCADA System

  • Financing : -
  • Service : -
  • Employer : -
  • Project Duration : -

EĞRİBUCAK WELLFIELD
Eğribucak well field consists of 3 deep wells supplying 150 L/s water with 3 high lift pumps . Existing submersible pumps were not replaced, but pipelines, valves and other equipment were totally renewed. One 250 kVA stand by generator was installed.

KARPUZATAN WELLFIELD
There are 6 wells and 3 high lift pumps of 110 kW each. 4 old submersible pumps were replaced with new ones, manually operated valves were replaced with motorized valves, pump lines were renovated, non-return valves were added. One 500 kVA stand by generator was installed.

KEYKUBAT WELLFIELD
There are 7 wells, a terminal reservoir and a pump station in Keykubat. Water is pumped with 4 high lift pumps of 200 kW each. 5 New submersible pumps were installed, manually operated valves were replaced with motorized valves, pump lines were renovated, non-return valves were added. One 500 kVA stand by generator was installed.