Kayseri Water Supply Project was financed by KfW, in order to prepare necessary upgrading of the network, design of the whole city and construction supervision.
Project Characteristics:
Present population: 600.000
Design population (N2025): 850.000
Present water demand: 117.115 m3/day
Design water demand: 177.706 m3/day
Water Supply Mains and Distribution Network
Supply mains: App. 230 km (DN200 mm - DN1000 mm)
Distribution network: App.560 km (DN100mm - DN250mm)
Network Rehabilitation: Digitization of supply system
Network zoning; Hydraulic modeling and design;
Services provided by ALTER;
Network Rehabilitation
- Digitization of supply system
- Network zoning
- Hydraulic modeling and design
- Preparation of BoQs, confidential cost estimates and tender documents for pipe replacement (pipes, valves, hydrants) and flow meter in accordance with FIDIC rules (RED BOOK)
- Assistance for tender evaluation and contract award
- Construction supervision
Leakage Management
- Network analysis in pilot districts for leakage management
- Design of district metering system
- Identification of priority investments
- Supervision of leak detection-repair and renewal measures
- On the job training of KASKI staff for leakage control
Rehabilitation of Pump Stations
- Assessment for exchange of existing pumps
- Design for pump installation, piping and standby generators, preparation of BoQs, confidential cost estimates and tender documents in accordance with FIDIC
- Assistance for tender evaluation and contract award
- Supervision of construction and installation
SCADA Extension
Locating the RTUs, system design, tendering ,supervision, hand over and commissioning of extended SCADA system