Kayseri Water Supply Project

  • Financing : Equity Capital
  • Service : Water Supply
  • Employer : General Directorate of Water and Sewerage Administration of Kayseri - KASKİ
  • Project Duration : 1997 - 2003

Kayseri Water Supply Project was financed by KfW, in order to prepare necessary upgrading of the network, design of the whole city and construction supervision.

Project Characteristics:

Present population: 600.000

Design population (N2025): 850.000

Present water demand: 117.115 m3/day

Design water demand: 177.706 m3/day

Water Supply Mains and Distribution Network

Supply mains: App. 230 km (DN200 mm - DN1000 mm)

Distribution network: App.560 km (DN100mm - DN250mm)

Network Rehabilitation: Digitization of supply system

Network zoning; Hydraulic modeling and design;

Services provided by ALTER;

Network Rehabilitation

  • Digitization of supply system
  • Network zoning
  • Hydraulic modeling and design
  • Preparation of BoQs, confidential cost estimates and tender documents for pipe replacement (pipes, valves, hydrants) and flow meter  in accordance with FIDIC rules (RED BOOK)
  • Assistance for tender evaluation and contract award
  • Construction supervision

Leakage Management

  • Network analysis in pilot districts for leakage management
  • Design of district metering system
  • Identification of priority investments
  • Supervision of leak detection-repair and renewal measures
  • On the job training of KASKI staff for leakage control

Rehabilitation of Pump Stations

  • Assessment for exchange of existing pumps
  • Design for pump installation, piping and standby generators, preparation of BoQs, confidential cost estimates and tender documents in accordance with FIDIC
  • Assistance for tender evaluation and contract award
  • Supervision of construction and installation

SCADA Extension

Locating the RTUs, system design, tendering ,supervision, hand over and commissioning of extended SCADA system